Prevention, protection, preparation and repair: measures to reduce flood risk along the axis of the Ebro
Alfonso Calvo Tomás - Head of the Environmental Studies Service
David Gargantilla Cañero - Head of the Waterways Action Service
Lorenzo Polanco Fernández - Head of the Environmental Management Department
María Luisa Moreno Santaengracia - Head of the Hydrology and Waterways Department
Miriam Pardos Duque - Head of the Public Water Systems Management Department
Javier San Román Saldaña - Deputy Commissioner
René Gómez López de Munain - Waters Commissioner
Waters Commission, Ebro Basin Authority
There are two pillars here: The first one is coordination. This entails joint work that has prompted definition of the Ebro Resilience Strategy (opens in a new window) and has brought together the Ministry for the Ecological Transition and the Demographic Challenge, the Ebro Basin Authority and the regional governments of La Rioja, Navarre and Aragon, while including the direct participation of local institutions in the search for a consensus among affected, associations and academia.
The second one is the pursuit of new approaches to what is a complex problem and an inevitable natural phenomenon. This calls for combined efforts to diminish its negative effects. There is no single or definitive solution and everything done in the past has led towards seeking a necessary change of model to achieve different results.
The previous phases of implementation of Directive 2007/60 initially consist of performing the preliminary flood risk assessment (the PFRA) for each hydrographic basin and pinpointing the Areas with a Potentially Significant Risk of Flooding (APSRF), and then secondly, acquiring knowledge of the extent of floods under various different probability scenarios by producing Flood Hazard and Risk Maps.
For its part, the FRMP for the Ebro Area (PGRIEbro), the third phase of the Directive, is intended to raise awareness of flood risk and promote self-protection among the population and both social and economic actors; make territorial planning adequate; improve predictive capacity; strengthen coordination among public administrations; reduce the vulnerability of exposed elements; lessen the hazardousness of flooding, and upgrade the condition of water bodies.
Within the Ebro river basin some 1,721 km of rivers have been defined as APSFRs, which were identified in the PFRA as those stretches of river where the flood risk is greatest, i.e. where the loss from flooding may be highest. The entire mid-section of the Ebro is an APSFR.
Hazard and risk maps have been made for over 4,000 km of rivers and they examine three separate return periods or possible scenarios: high, medium or low flood frequencies. These are respectively associated with a statistical likelihood of occurrence every 10, 100 or 500 years. These maps will be fed into the National Flood Zone Mapping System (SNCZI for the Spanish) and are accessible for all government bodies and individuals using our “SITEbro” map viewer, representing a publicly available tool for decision-making.
- River and hydrological / forestry restoration, which we will go on to examine and is covered in the types of intervention that are carried out along the mid-section of the Ebro.
- The draining of linear infrastructure, with examples that we will also cite as illustration.
- Flood forecast. This is a commitment to improving our ability to forecast, which in the Ebro basin is represented by the Decision Assistance System, the SADEbro. This allows improved management of flooding with optimised intervention of the basin’s regulation infrastructure.
- The civil protection measures used to safeguard people and property before, during and after a flood, which are fleshed out in the municipal, district, regional and national civil protection plans to guard against flood risk.
- Territorial planning and urban development. This part addresses the need to make the uses to which the land is put in flood zones compatible with flooding as a phenomenon. The answer to this is should be found in the regulatory framework and planning by government bodies.
- Promoting insurance, to curtail economic vulnerability to flooding and intended to involve private individuals, as well as those who own property and engage in business activities that are exposed to floods. Here, the Consorcio de Compensación de Seguros has an extremely important role to play in the recovery process.
- Structural measures. Associated with a cost/benefit analysis and which represent the civil engineering solution wherever people and property have to be protected and which, in combination with improved forecasting in preparation for flood events, serves to offset their adverse effects.
The regulatory framework and self-protection
The more specific nature of current regulations allows determination of adequate and proportional measures for uses in Preferential Floodway Areas (within the flood zone and associated with surges having a 100-year return period), which are allocated to reducing exposure and vulnerability to flood risk, as well as the avoidance of further set-ups of vulnerable activities in the Preferential Floodway Area.
The latest amendment of the Hydraulic Public Domain Regulations (RDPH for the Spanish “Reglamento del Dominio Público Hidráulico”) of December 2016 proposes that, to the extent that it is possible, the tendency should be to “widen the breadth of the channel and not aggravate floodability and the pre-existing risk”. It also suggests only building defensive construction work raised above the sides of the watercourse in the Preferential Floodway Area “when these protect existing population centres and public infrastructure”.Yet, these measures are not merely directed at laying down how we should approach our relationship with the flood zone from now onwards, as efforts have also been made to mould life as it already is to flood risk by taking protective or adaptive action to reduce the vulnerability of pre-existing elements, or else by removing them if we cannot manage to do this.
In this respect, the Ministry for the Ecological Transition and the Demographic Challenge has published a series of guides including some on reducing the vulnerability of buildings to flood risk, adapting farming and livestock concerns to the risk, recommendations about refitting buildings in flood zones and one on good practices in action to preserve, maintain and improve watercourses.
Following these criteria and within the scope of the Ebro Resilience Strategy, the Ebro Basin Authority (CHE for the Spanish) is conducting a pioneering campaign in Spain featuring a hundred specific studies of adaptation work on farms and/or livestock concerns at no cost to those wishing to benefit from it. The studies are being carried out among volunteer owners and they conclude with a presentation of alternative solutions plus a cost/benefit analysis for each of them.
Within the context of the Ebro Area’s Hydrological Plan, in 2016 a standard Declaration of Responsibility was defined for processing minor activities to preserve the Hydraulic Public Domain (HPD).
The declaration means speeding up and cutting down on processing for interventions of little consequence which third parties apply for who have to have authorisation from the basin authority when the actions satisfy two preconditions:
1. They are outside protected areas (subject to specific environmental rules).
2. They do not affect other parties.
- Removing dead trees and pruning those that hamper access to the watercourse or its right of way, provided that these do not involve any loss of the bank’s arboreal substrate.
- Removing dead trees and pruning those that diminish the watercourse’s drainage capacity.
- Removing items carried along by the current and which block the watercourse, especially crossings or work that represents an element that degrades or pollutes the Hydraulic Public Domain.
- Maintenance on gauging sections in official networks of gauging stations.
The CHE has recently passed another measure that is intended to foment a commitment to flood-resistant crops in the Ebro basin.
This has been brought in by regularisation of the charges on occupying public land with farming. This has changed from an across-the-board levy to one which takes into account two factors: the zoning according to the flood period and the rateable value of the adjacent property adapted to the Ebro basin.
A better understanding of the mid-section of the Ebro
The kinematic data logged speaks to us of a rising trend in annual maximum flows and a higher recurrence of extreme phenomena over recent years (comparison is made between the actual system of flows, lamination on account of reservoir management and the natural system, which means the maximum flows that might have occurred without dams):
Knowledge is also helping us to debunk another of the myths about the actual situation regarding the Ebro waterway and which was leading us astray in efforts to hit on the necessary definition of the right measures. This concerns the widespread belief that there has been a build-up of sediment, which translates into the public calling for a “clean-up”. This would in actual fact imply wholesale dredging activity as the core solution.
In 2019, new bathymetry of the watercourse was conducted along the middle stretch of the Ebro (the previous exercise having been in 2005), which allows us to conclude that no incision nor generalised accumulation has occurred with respect to the riverbed.
Types of action to improve safety in flooding
In executing the emergency action following the extraordinary flood events in 2015, and particularly in 2018, the Ebro Basin Authority began to implement a programme of measures aimed at, not only recovery, but also building up resilience via action that also kept to the lines in the EU Floods Directive and consequently the Flood Risk Management Plan. These interventions are chiefly intended to protect population centres.
We now move on to examination of these categories. In addition to direct interventions, we have one sort known as Type T0, which also falls within the direct remit of this organisation and consists of managing regulation infrastructure and reservoirs thanks to the development of forecasting systems such as our Decision Assistance System (SADEbro) and our telematic control networks, the internationally recognised Automatic Hydrological Information System (SAIHEbro), which, where possible, allow moving flows to be reduced and surge points on certain tributaries not to run into each other.
Beneficial and reducing effect (lamination) for the municipality of Alcañiz from managing the Calanda reservoir (Teruel) during a flood event in April 2020. The blue line is the actual circulating flow whereas the red one is the hypothetical one, should not have the flood being laminated by the Calanda reservoir.
Type T1: improving structural defences
- Construction of new infrastructure
In 2nd line> of 7 km
- Modification of existing infrastructure: repair, levelling or reinforcement
>150 km in 2015
>110 km in 2018
Type T2: improving the draining capacity of the watercourse
- Setting back >11,000 m
- Lowering >2,000 m
- Removing >1,600 m
A. Setting back a dyke in Alfaro (LR) 710 m. River Ebro.
B. Dyke removal at Cabañas de Ebro (Z).
C. Novillas (Zaragoza). Work on vegetation and obstructive elements. River Ebro.
27 Actions carried out:
”Curage” in Utebo (Zaragoza). Above: plan. Bottom: during flooding of the Ebro.
River Ebro, “Mejana del Tormo” in Alagón (Zaragoza).
Curage in Alfaro (La Rioja) after the action of a flood on the River Ebro.
Type T3: permeabilization involving infrastructure. Relief channels
- Novillas
- Frías
- Pradilla de Ebro
- Pina de Ebro
Pradilla de Ebro, increasing the permeability of the bridge over the river Ebro.
Frames on the river Ebro next to the CV-04 bridge in Novillas (Zaragoza) and integrable frames on the A-1107 road. Pina de Ebro (Zaragoza).
- Alfaro
- Novillas
- Alcalá de Ebro
- Cabañas de Ebro
- Pina de Ebro
- Tauste
River Ebro relief channel at Alcalá de Ebro (Zaragoza).
Type T4: Overflow safety cordon
Existing infrastructure is used (paths, roads, walls...) which is levelled or built up to construct a cordon that surrounds the town or city centre to either delay or avoid it being flooded by water that has burst its banks. Sealing elements have to be applied to structures along the perimeter (livestock crossings, irrigation ditches...) that prevent or hinder water from coming into the urban centre.
Boundary posts are also installed along the cordon, which are intended to enable monitoring of the progress of water-levels in situ and at any given time to find Height/time correlations to assist in decision-making, such as in the event of any evacuation.
To date, these have been formed at 12 urban centres along the Ebro and they continue to be made.
- Novillas
- Sobradiel
- Alcalá de Ebro
- Alfocea (Z)
- Pradilla de Ebro
- Boquiñeni
- Cabañas de Ebro
- Pina de Ebro
- Torres de Berrellen
- Remolinos
- Monzalbarba (Z)
- Quinto
Type T5: Temporary flood areas
By drawing away significant volumes of water from the river and diverting them laterally, the presence of a temporary flood-prone area does not just bring benefits along the stretch of river located downstream (as one might think at first). The fields that become flooded within the area also reap benefits in several respects.
Thus, if a dyke bursts or there is overflowing (even from upstream along the bank), the impact on the fields and their infrastructure turns out to be greatly diminished or even non-existent, as the dammed water acts with a cushioning effect. The damage to the dyke itself is reduced, since the drop is reduced from it having been overrun. There is also a reduction in the differential between the hydrostatic pressures on the inner and outer slopes of the dyke. Finally the emptying out of the area occurs in a far shorter time as it is equipped with additional relief devices that allow the pent up water back into the waterway at the time when the river level falls below that of the flooded area.
At the moment, the 11 areas constructed (all in Aragon) allow temporary diversion and storage of over 11 hm3, taking up slightly more than 80 ha. It should be pointed out that a higher number of areas benefit proportionally, given that we would be letting the river use “extra” areas at precisely the time when this is most needed and not before; in other words in flood events when the corridor between dykes is often not enough to cope.
- Novillas
- Pradilla
- Pina de Ebro (2)
- Alagón
- Boquiñeni
- Remolinos
- Torres de Berrellén
- Sobradiel
- Utebo
- Alfocea

A. Controlled flood-prone area in Novillas (Z). River Ebro.
B. Free temporary flood-prone area at Mejana de la Cruz in Alagón (Z). River Ebro.
Ebro Resilience
The strategy is a partnership mechanism for implementing flood risk management measures along the mid-section of the Ebro. It is the fruit of coordination among government bodies: The Ministry for the Ecological Transition and the Demographic Challenge, the Ebro Basin Authority and the regions of La Rioja, Navarre and Aragon, while also striving for collaboration with local councils and consensus with stakeholders in the territory.
Ebro Resilience divides its proposed river model into two separate zones: urban and non-urban environments.
The design for urban zones is to protect localities against river surges with a 25-year return period and for non-urban zones it is to ensure the draining away of the maximum normal water level rise and a reduction of effects for river surges for a return period of up to 10 years.
Within the Ebro Resilience Strategy detailed studies are being made of the flood risk on the 15 stretches with the biggest detected problems in surge events. The studies will define the actions to be taken to meet the objectives outlined in the previous paragraph. The sections being studied are:
- The river Ebro in Logroño and Viana.
- The river Ebro in Lodosa.
- The rivers Ebro and Ega in San Adrián, Calahorra and Azagra.
- The river Ebro from Alfaro to Tudela.
- The river Ebro from Fontellas to Buñuel.
- The rivers Ebro and Huecha in Mallén, Cortes and Novillas.
- The river Ebro in Pradilla de Ebro and Boquiñeni.
- The river Ebro in Alcalá de Ebro and Remolinos.
- The river Ebro in Cabañas de Ebro.
- The river Ebro in Torres de Berrellén and Sobradiel.
- The river Ebro from Utebo to Zaragoza.
- The river Ebro from Zaragoza to Pastriz.
- The river Ebro in El Burgo de Ebro.
- The river Ebro between Osera de Ebro and Quinto.
- The river Ebro between Quinto and La Zaida.
Together with these studies over the mid-section of the Ebro, the Ebro Basin Authority is currently undertaking two interventions to serve as benchmarks for river restoration that are intended to reduce the impact of flooding: the hydrological connection and the recovery of habitats on meanders in the lower section of the Arga in Funes, Navarre, and the morphological adaptation and environmental recuperation of the river Ebro at the Paraje de La Nava in Alfaro, La Rioja.
Hydrological connection on the lower section of the Arga in Funes (Navarre)
Restoring the natural environment at the confluence of the rivers Arga and Aragón is included within the Environmental Advancement Plan for Adaptation to Climate Change in Spain (PIMA-Adapta) and the FRMP for the Ebro basin (PGRIEbro).
The funding for the project is being met by the Directorate General for Water at the Ministry for the Ecological Transition and the Demographic Challenge, while the Navarre regional government is covering compensation for loss of profits on poplar tree cultivation and the Funes council has made communal land available for the work.
Intervention on the River Ebro at the Paraje de La Nava (La Rioja).
The intervention began in December 2019. The work mainly consists of removing 1,806 metres of the existing defences which runs parallel to the watercourse to be rebuilt in a position where it has been set back at a distance of between 100 and 300 metres along some 1,376 metres.
These tasks will be undertaken during the summer of 2020 in the low-water period. With the setting back of the defensive system some 30 hectares of irrigated plain will be reclaimed, where river restoration will take place featuring the planting of indigenous fertile plain species (7,000 assorted poplars, 1,600 ash trees and 1,800 bushes and shrubs such as willow, tamarisk, dogwood, hawthorn, blackberry and rose-bushes). There are also plans to create a zone of habitats suitable for the European mink by building a mosaic of wetland environments in the reclaimed plain area with over 1,300 aquatic plants.
Conclusion
The upkeep of public waterways is the competency of the Water Commissioners of the Basin Authorities (R.D. 984/1989 of 28 July) and it is important to appreciate what this means. Public waterways are the land covered by waters at the maximum level of normal rise, which, on the Ebro’s mid-section, is that which takes place every two or three years. It is therefore the duty of the basin authorities to protect the banks and adjacent plains and to ensure that the watercourse is able to evacuate a normal river flood, but not those classed as extraordinary, which, by definition, run along the river banks(i.e. across the flood-prone zone, its flood plain).
This is reasonable, given that ordinary flooding runs along the hydraulic public domain but extraordinary floods affect privately-owned land located in the bordering areas or policed zones where the basin authorities do not have full competency.
The role of preserving waterways that is commended to basin authorities has a restriction on it that is set out in Law 10/2001 of the National Hydrological Plan (article 28.4), which stipulates that actions involving public waterways located in urban settings shall be the responsibility of the competent authorities regarding territorial planning and urban development (regions and, mainly, councils).
Nonetheless, the mid-section of the Ebro presents a high risk of flooding, with extraordinary floods that cause substantial damage and endanger the lives of the inhabitants on the plain, the frequency of floods having increased in recent decades.
From the flood in 2003 onwards, the Ebro Basin Authority began to implement original measures aimed at achieving integrated flood management. On one hand, actions started to be undertaken that were designed to reclaim river space. On the other hand, also beginning in that year, the Decision Assistance System started in operation, which incorporates a set of hydro-meteorological forecasting models and enables improved management of reservoir control in flooding situations. In addition to this, the reservoir at Itoiz (Navarre) was commissioned in 2004, which has considerable capacity for laminating flooding on the mid-section of the Ebro.
The coming into effect of the 2007 Floods Directive represented a change of model, when the basin organisation drafted the first Ebro Flood Risk Management Plan (December 2015), which is the framework instrument that covers a whole range of measures for the government bodies to implement which have competency for several issues, such as urban development, territorial planning, the natural environment, forest management, insurance, hydrology, hydraulics, etc.
In 2010, Royal Decree 903 on assessing and managing flood risks was published, which transposes the earlier directive and establishes that the Ministry for the Ecological Transition and the Demographic Challenge, the Ministry of the Interior, the regional and local governments shall, within the scope of their respective competencies, draw up the programmes of measures and perform the actions to manage flood risk. This means that managing the risk of flooding (extraordinary river floods) is the responsibility of all the arms of government involved.
Extraordinary river floods are inevitable, but we can make them less frequent, relieve the harm they cause and improve the recovery of people and property that are affected. Experience has taught us that we cannot resolve the problem by clearing and cleaning up rivers.
With these goals in mind the Ebro Resilience Strategy was came into being in 2017, which is framed within the National River Restoration Strategy. A new management model for the river Ebro with the philosophy of reclaiming river space, giving it more room to laminate (to begin to store water at its edges and slacken its flow as it moves forward) and for the water to both slow down and drop in depth, such that this reduces damage.
This strategy embraces both non-structural measures: development-related, adaptation of vulnerable (urban, agricultural and livestock) elements, restoration and safeguarding of ecosystems, and acquiring land; and structural measures: setting back dykes, controlled flood areas, permeabilization of infrastructure, occasional dredging, relief distributaries, “curage”, etc.
The scope of this project is a 324 km length of the river Ebro at its middle section, from Logroño to La Zaida, with over a million affected inhabitants on the land neighbouring the river.
It is a strategy which is being implemented by the regional governments of La Rioja, Navarre and Aragon in conjunction with the Ministry for the Ecological Transition and the Demographic Challenge, as well as the Ebro Basin Authority. It is also one which could not be successfully brought to fruition without the determined and vital participation of councils, affected parties, those performing irrigation, environmental groups and universities.